Welcome to the company ! we have many years of professional experience !
rsdgj@pyzyrsd.com +86 13525609655

Air Cylinders

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 13525609655

E-Mail

rsdgj@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

Air Cylinders
Dongying welldrill petroleum Equipment Co. Ltd
Dongying welldrill petroleum Equipment Co. Ltd

Catwalk, Wellhead Equipment Elevator Link Tong ,Power, slip Manual slip Roller Kelly Bushing IRON ROUGHNECK ,Power, tong Hydraulic ,Power, Unit (HPU) Kelly spinner: Well Control Equipment and Accessories S Type Ram BOP Annular BOP Diverters BOP Control Systems (API-16D) Spacer spool Adapter spool Double studded Adapter Flange (DSAF) ,drilling, spool ...

Drilling Equiepment - Bomcobras
Drilling Equiepment - Bomcobras

and also has tubing ,catwalk, for lifting tubing from ground to the upper Basket. Technical ,parameter Parameter, Unit Model BYJ70/35FQ Lift Force kN 675 Snub Force kN 430 Working Pressure MPa 35 Operation Pressure MPa 21 Lift Velocity m/s ≥0.2 Snub Velocity m/s ≥0.3 Stroke m 3.5 Bore Size mm φ180 Engine Type C13 ,Power, Bhp(bkW) 440(328)

DRILLING SIMULATION
DRILLING SIMULATION

A full range of drilling parameters are provided to trainees including ROP, WOB, Torque on Bit and Delta-P. Supported well control features include Wait and Weight Method; Driller’s Method; and Volumetric Method. Drilling Simulator is also designed to fully support use of actual rig control hardware.

A review on casing while drilling technology for oil and ...
A review on casing while drilling technology for oil and ...

1/3/2019, · This is a critical parameter in operation which ensures that additional torque will not exceed the torque limit of casing or the makeup torque of connection. In directional drilling, toque and drag become the most important parameters in determining the suitability of a well for casing drilling. The equations used to calculate torque are Eqs.

(PDF) SPECIFICATION FOR A LAND 2000 HP DRILLING RIG | 镇泽 …
(PDF) SPECIFICATION FOR A LAND 2000 HP DRILLING RIG | 镇泽 …

4 Height from rig floor ft 84 5 Racking platform suitable for inch 3-1/2 DP--- 5-1/2 DP DP range 6 Racking platform suitable for inch 11 1/4”DC-3-1/8”DC DC range D.1.3 Casing stabbing Board 1 Casing Stabbing Board make : BOMCO, China 2 Stabbing Board adjustable ft-ft 23-50 from to D.1.4 Substructure 1 Substructure make-type : BOMCO, DZ450/10.5-S 2 Substructure built as per API nr yes ...

Rig 801 850XE 11-8-17 - AKITA Drilling
Rig 801 850XE 11-8-17 - AKITA Drilling

1,800hp AC Triple Mast Walking ,Drilling, Rig SUBSTRUCTURE Swing Up ‐ 3 piece Center Section with Rig Runner™ integrated walking System Floor Height: 31’‐0” (9.45m) Clear Height (beneath rotary beams): 27’‐0” (8.23m) Rotary Capacity: 850,000 lbs (386 Metric Tons)

1.0 Rig mast and relevant equipments - PetroRigs.com
1.0 Rig mast and relevant equipments - PetroRigs.com

CW three (3) set stairs, V-Door slope, ,catwalk, with triangle section pipe racks, etc. Equipped with two sets of doghouses placed on the right and left side of the ,drilling, floor and One (1) metal construction grasshopper frame for supporting utility and

DRILLING SIMULATION
DRILLING SIMULATION

A full range of drilling parameters are provided to trainees including ROP, WOB, Torque on Bit and Delta-P. Supported well control features include Wait and Weight Method; Driller’s Method; and Volumetric Method. Drilling Simulator is also designed to fully support use of actual rig control hardware.

Used Hydraulic Power Tong for sale. Schuler equipment ...
Used Hydraulic Power Tong for sale. Schuler equipment ...

Zhong Tong Used Coach Express 55 passengers seats 12 meters Vehicle ,Parameter, Overall length(mm) 12000 Overall breadth(mm) 2550 Overall height(mm) 3830 Inner height(mm) 2350 Wheel Base(mm) 6000 Overhang front/rea...

Dongying welldrill petroleum Equipment Co. Ltd
Dongying welldrill petroleum Equipment Co. Ltd

Catwalk, Wellhead Equipment Elevator Link Tong ,Power, slip Manual slip Roller Kelly Bushing IRON ROUGHNECK ,Power, tong Hydraulic ,Power, Unit (HPU) Kelly spinner: Well Control Equipment and Accessories S Type Ram BOP Annular BOP Diverters BOP Control Systems (API-16D) Spacer spool Adapter spool Double studded Adapter Flange (DSAF) ,drilling, spool ...

Rig 801 850XE 11-8-17 - AKITA Drilling
Rig 801 850XE 11-8-17 - AKITA Drilling

1,800hp AC Triple Mast Walking ,Drilling, Rig SUBSTRUCTURE Swing Up ‐ 3 piece Center Section with Rig Runner™ integrated walking System Floor Height: 31’‐0” (9.45m) Clear Height (beneath rotary beams): 27’‐0” (8.23m) Rotary Capacity: 850,000 lbs (386 Metric Tons)

A review on casing while drilling technology for oil and ...
A review on casing while drilling technology for oil and ...

1/3/2019, · This is a critical parameter in operation which ensures that additional torque will not exceed the torque limit of casing or the makeup torque of connection. In directional drilling, toque and drag become the most important parameters in determining the suitability of a well for casing drilling. The equations used to calculate torque are Eqs.

1.0 Rig mast and relevant equipments - PetroRigs.com
1.0 Rig mast and relevant equipments - PetroRigs.com

CW three (3) set stairs, V-Door slope, ,catwalk, with triangle section pipe racks, etc. Equipped with two sets of doghouses placed on the right and left side of the ,drilling, floor and One (1) metal construction grasshopper frame for supporting utility and

Drilling Equiepment - Bomcobras
Drilling Equiepment - Bomcobras

and also has tubing ,catwalk, for lifting tubing from ground to the upper Basket. Technical ,parameter Parameter, Unit Model BYJ70/35FQ Lift Force kN 675 Snub Force kN 430 Working Pressure MPa 35 Operation Pressure MPa 21 Lift Velocity m/s ≥0.2 Snub Velocity m/s ≥0.3 Stroke m 3.5 Bore Size mm φ180 Engine Type C13 ,Power, Bhp(bkW) 440(328)

FACULTY OF SCIENCE AND TECHNOLOGY
FACULTY OF SCIENCE AND TECHNOLOGY

There are two technologies on ,drilling, which could become the solution for these challenges; ,drilling, with casing and expandable casing. These two technologies that were operated separately show promising results even the developments are still on going. On this thesis author would like to bring a step further by seeing the possibilities of

Casagrande XP Hydraulic Rig - Casagrande 19.3 PM XP ...
Casagrande XP Hydraulic Rig - Casagrande 19.3 PM XP ...

SPM control system – Smart ,Power, Management; 12″ touch screen display for visualization and ,drilling parameter, settings; Mast lifting and lowering aid; ,Drilling, depth measurement and automatic mast verticality control; Automatic idling mode with engine start/stop for fuel saving; Rotary shaking system for tool discharge; Hook on auxiliary line

Oil and Gas Connectors Driven by Automated Drilling Technology
Oil and Gas Connectors Driven by Automated Drilling Technology

As a company that provides oil and gas industry connectors and connector solutions, it’s worth asking what the oil and gas industry will look like in the next decade.. A new report by industry adviser DNV GL suggests that the future of oil and gas technology is in automation. The company noted some parts of the oil and gas sector are riper for automation than others.

Chat Online Inquiry Email

Business cooperation

+86 13525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City