Welcome to the company ! we have many years of professional experience !
rsdgj@pyzyrsd.com +86 13525609655

Hydraulic Pack

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 13525609655

E-Mail

rsdgj@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

Hydraulic Pack
SIMPLE TIPS TO CONSIDER FOR ANY RIG ... - Drilling Manual
SIMPLE TIPS TO CONSIDER FOR ANY RIG ... - Drilling Manual

2. Install cellar jet and function test it (fill cellar with water and drain it to waste pit with cellar jetting). 3. Make sure all the clamps for all high pressure lines installed. 4. Make sure that the fall arrestors below drill floor installed for work on BOP’s. 5. Install the flow line and leak test same.

Calaméo - Tenaris Hydril Running Manual
Calaméo - Tenaris Hydril Running Manual

Connection Specific Running Guidelines IDM Code GDL23367/1 / March 2018 Pulling 1. Automatic ,stabbing, system or stabber is highly recommended to maintain the pipe in a vertical position. 2. The use of a ,stabbing, guide is recommended to assist in centralising the pin to prevent hang up. 3.

WorkSafeBC
WorkSafeBC

23.41 ,Stabbing, boards (1) A ,stabbing board, must be used by a worker located above the derrick floor during the running of casing or tubing, or well servicing operations. (2) A wooden ,stabbing board, must (a) be fitted with expanded metal or wire rope fastened to the underside and along the full length of the ,board,,

Casing Running Systems and Tools - NOV Inc.
Casing Running Systems and Tools - NOV Inc.

The casing module consists of an upper tong, backup tong, and a ,stabbing, guide. It is easily and quickly hooked on to the roughneck by hydraulic and electric quick connectors. Zone management and safety systems, including the NOV Torque Turn casing drilling logging system, ensure efficient, safe, and reliable makeup and breakout performances when fully automated and integrated into NOV control systems.

CPT Powertools | Complete Sales Spares and Repair Service
CPT Powertools | Complete Sales Spares and Repair Service

CPT also offer a fast spares and accessories service on the majority of tool manufacturers, such as ,Chicago Pneumatic,, Atlas Copco, Desoutter, Bosch, Trelawny, Enar, Nitto Kohki, Universal Tool, to name but a few. If it is ,Pneumatic,/Hydraulic accessories you are after, just request a copy of our 2016/2017 CPT Accessories Catalogue.

1500 HP SCR Mobile Desert Drilling Rig Example Specifcations
1500 HP SCR Mobile Desert Drilling Rig Example Specifcations

drum, drawworks mounted on a heavy-duty framework, with ,sheet, metal covers and provisions for mounting two (2) DC Drive Motors. Auxiliary Braking is achieved with an Eaton Airflex (or equivalent) water cooled assist brake. ,Specifications,: Main Drum: Model: TSM 1500SD DC …

ISO 10405 : Petroleum and Natural Gas Industries - Care ...
ISO 10405 : Petroleum and Natural Gas Industries - Care ...

This International Standard establishes practices for care and use of ,casing, and tubing. It specifies practices for running and pulling ,casing, and tubing, including drifting, ,stabbing,, making up and lowering, field makeup, drifting and landing procedures.

ENI - Drilling Procedures Manual by NED SPE STUDENT ...
ENI - Drilling Procedures Manual by NED SPE STUDENT ...

Wait on cement. 5 Hang the 9 /8” casing on the first intermediate casing spool giving it the additional tensile load calculated as per the ‘Casing Design Manual’ (STAP P1M6110-8.3.4), if 5 ...

SPECIFICATIONS
SPECIFICATIONS

SPECIFICATIONS, filed on July 22nd, 2019

Pyramid Product Line 1 | Drilling Rig | Offshore Drilling
Pyramid Product Line 1 | Drilling Rig | Offshore Drilling

The ,casing stabbing board, has a mono-rail track, which provides smoother carriage travel, better visibility and a greater freedom of movement, promoting efficiency of the rig. The boards are adjustable from 23 feet to 47 feet above the drill floor and designed to be mounted in a customer specified location.

Pyramid Product Line 1 | Drilling Rig | Offshore Drilling
Pyramid Product Line 1 | Drilling Rig | Offshore Drilling

MH Pyramid Casing ,Stabbing, Boards are designed for safe travel within the drilling structure and is known for long, proven operation service time in environments encompassing the globe. The casing ,stabbing board, has a mono-rail track, which provides smoother carriage travel, better visibility and a greater freedom of movement, promoting efficiency of the rig.

SUBJECT: FIELD RUNNING AND HANDLING PROCEDURES
SUBJECT: FIELD RUNNING AND HANDLING PROCEDURES

4.2.8 A ,stabbing board, or a yoke may be required to offer stability for ease of make-up. 4.2.9 Ensure that the power tong snub line is at 90° and level with the tong. NOTE: Ensure that an accurate torque monitoring device (Martin-Decker torque gauge) is available, the load cell is for use in the required torque range, and the load cell has

Occupational Health and Safety Regulation
Occupational Health and Safety Regulation

Stabbing, boards. 23.41 (1) A ,stabbing board, must be used by a worker located above the derrick floor during the running of casing or tubing, or well servicing operations. (2) A wooden ,stabbing board, must (a) be fitted with expanded metal or wire rope fastened to the underside and along the full length of the ,board,,

SPECIFICATIONS
SPECIFICATIONS

SPECIFICATIONS, filed on July 22nd, 2019

Occupational Health and Safety Regulation
Occupational Health and Safety Regulation

23.41 (1) A stabbing board must be used by a worker located above the derrick floor during the running of casing or tubing, or well servicing operations. (2) A wooden stabbing board must (a) be fitted with expanded metal or wire rope fastened to the underside and along the full length of the board,

Occupational Health and Safety Regulation
Occupational Health and Safety Regulation

23.41 (1) A ,stabbing board, must be used by a worker located above the derrick floor during the running of casing or tubing, or well servicing operations. (2) A wooden ,stabbing board, must (a) be fitted with expanded metal or wire rope fastened to the underside and along the full length of the ,board,,

Occupational Health and Safety Regulation
Occupational Health and Safety Regulation

Stabbing boards. 23.41 (1) A stabbing board must be used by a worker located above the derrick floor during the running of casing or tubing, or well servicing operations. (2) A wooden stabbing board must (a) be fitted with expanded metal or wire rope fastened to the underside and along the full …

Chat Online Inquiry Email

Business cooperation

+86 13525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City